According to the public relations office of the university, the Administrative and Financial Deputy of Qom University of Technology stated: In order to determine the load-bearing capacity and soil resistance of the campus dormitory land and identify its specialized and engineering characteristics, necessary operations for geotechnical testing of the campus dormitory were carried out. The results of this testing will be used to prepare structural maps. Dr. Al Omrani Nejad said: The student dormitory of Qom University of Technology is defined in three operational phases. Currently, the architectural plans in the first phase have been completed, and the necessary correspondence for obtaining a building permit from the municipality of District 3 has been completed and will soon enter the execution stages.